We use cookies to understand how you use our site and to improve your experience. This includes personalizing content and advertising. To learn more, click here. By continuing to use our site, you accept our use of cookies, revised Privacy Policy and Terms of Service.
You are being directed to ZacksTrade, a division of LBMZ Securities and licensed broker-dealer. ZacksTrade and Zacks.com are separate companies. The web link between the two companies is not a solicitation or offer to invest in a particular security or type of security. ZacksTrade does not endorse or adopt any particular investment strategy, any analyst opinion/rating/report or any approach to evaluating individual securities.
If you wish to go to ZacksTrade, click OK. If you do not, click Cancel.
TechnipFMC Secures Contract From TOTAL Arm for Zinia 2 Field
Read MoreHide Full Article
TechnipFMC plc (FTI - Free Report) recently received a contract from a subsidiary of TOTAL S.A. for developing the Zinia Phase 2 field, which lies 150 kilometers off the coast of Angola. The field is located in Block 17 and situated at a water depth of 800-1,000 meters.
During May-end, TOTAL made the final investment decision of the project. At the end of June, Subsea 7 S.A. (SUBCY - Free Report) received the subsea flowlines and umbilicals engineering, procurement, installation and commissioning contract for the Zinia Phase 2 field. Once completed, the project will have an output capacity of 40,000 barrels a day. TOTAL, operator of Block 17 with a 40% interest, has Equinor ASA (EQNR - Free Report) , ExxonMobil and BP as partners.
TechnipFMC’s Role
Per the deal, TechnipFMC, which already has a strong presence in Angola, is committed to provide engineering, procurement and construction services for subsea equipment. The project includes nine subsea tree units, along with wellheads, subsea control and connection systems, as well as systems-related equipment. The wells are tied back to the Pazflor floating production, storage and offloading (FPSO) vessel.
The supporting services related to the assembling, testing, mobilization and installation of the project are also included in the deal. The financial details of the contract were not disclosed. The oilfield service provider, which has a longstanding relationship with TOTAL and has supported many of the latter’s subsea developments, has incorporated the deal in its second-quarter 2018 results.
It's hard to believe, even for us at Zacks. But while the market gained +21.9% in 2017, our top stock-picking screens have returned +115.0%, +109.3%, +104.9%, +98.6%, and +67.1%.
And this outperformance has not just been a recent phenomenon. Over the years it has been remarkably consistent. From 2000 - 2017, the composite yearly average gain for these strategies has beaten the market more than 19X over. Maybe even more remarkable is the fact that we're willing to share their latest stocks with you without cost or obligation.
Image: Bigstock
TechnipFMC Secures Contract From TOTAL Arm for Zinia 2 Field
TechnipFMC plc (FTI - Free Report) recently received a contract from a subsidiary of TOTAL S.A. for developing the Zinia Phase 2 field, which lies 150 kilometers off the coast of Angola. The field is located in Block 17 and situated at a water depth of 800-1,000 meters.
During May-end, TOTAL made the final investment decision of the project. At the end of June, Subsea 7 S.A. (SUBCY - Free Report) received the subsea flowlines and umbilicals engineering, procurement, installation and commissioning contract for the Zinia Phase 2 field. Once completed, the project will have an output capacity of 40,000 barrels a day. TOTAL, operator of Block 17 with a 40% interest, has Equinor ASA (EQNR - Free Report) , ExxonMobil and BP as partners.
TechnipFMC’s Role
Per the deal, TechnipFMC, which already has a strong presence in Angola, is committed to provide engineering, procurement and construction services for subsea equipment. The project includes nine subsea tree units, along with wellheads, subsea control and connection systems, as well as systems-related equipment. The wells are tied back to the Pazflor floating production, storage and offloading (FPSO) vessel.
The supporting services related to the assembling, testing, mobilization and installation of the project are also included in the deal. The financial details of the contract were not disclosed. The oilfield service provider, which has a longstanding relationship with TOTAL and has supported many of the latter’s subsea developments, has incorporated the deal in its second-quarter 2018 results.
Price Performance and Zacks Rank
London, UK-based oilfield service provider, TechnipFMC has gained 12.5% in the past year against 6.8% decline of its industry. Currently, TechnipFMC has a Zacks Rank #3 (Hold). You can see the complete list of today’s Zacks #1 Rank (Strong Buy) stocks here.
Today's Stocks from Zacks' Hottest Strategies
It's hard to believe, even for us at Zacks. But while the market gained +21.9% in 2017, our top stock-picking screens have returned +115.0%, +109.3%, +104.9%, +98.6%, and +67.1%.
And this outperformance has not just been a recent phenomenon. Over the years it has been remarkably consistent. From 2000 - 2017, the composite yearly average gain for these strategies has beaten the market more than 19X over. Maybe even more remarkable is the fact that we're willing to share their latest stocks with you without cost or obligation.
See Them Free>>